MAG SPRING NINGBO ZHENHAI I&E LTD is a leading specialist in dependable and environmental-friendly designing, manufacturing, exporting and importing for various industrial magnets and magnetic products that provide pioneering magnetic solutions for global customers.
Ferrit haltemagnet
2015年6月29日星期一
Electromagnetic separator debugging method before running
● Check the coil and electrical insulation properties of the motor, before electricity to meet the requirements after commissioning.
● Before magnetic plate separator run with a Megger, measure the winding insulation resistance and its value should not be in the magnet enclosure 10MΩ, check field winding wiring is correct, reliable, error-free behind the prospective use.
● before turning, indicating the oil level should be checked whether the standard cap oil. And in turn each channel of the switching power transmission and start excitation circuit, check out the fan air flow, flow meter indicates correctly. Otherwise, you should adjust the fans, pumps electrical wiring.
● always observe the voltmeter, ammeter reading of normal, not exceeding its rating.
● If in addition to the effect of poor iron, then adjust the hanging height or separator drum from front to back and head.
订阅:
博文评论 (Atom)
没有评论:
发表评论